Core units ICTNWK502 Implement secure encryption technologies ICTNWK509 Design and implement a security perimeter for ICT networks ICTNWK601 Design and implement a security system ICTNWK602 Plan
Core units CPCCCM2006 Apply basic levelling procedures CPCCOM1012 Work effectively and sustainably in the construction industry CPCCOM1013 Plan and organise work CPCCOM1014 Conduct workplace communication CPCCOM1015 Carry out measurements and calculations CPCCOM2001 Read and interpret plans and specifications CPCCWF2001 Handle wall and floor tiling materials CPCCWF2002 Use wall and floor tiling tools and equipment CPCCWF3001 Prepare surfaces for tiling application CPCCWF3002 Install floor tiles CPCCWF3003 Install wall tiles CPCCWF3004 Repair wall and floor tiling CPCCWF3005 Install decorative tiling CPCCWF3006 Install mosaic tiling CPCCWF3007 Tile curved surfaces CPCCWF3009 Apply waterproofing for wall and floor tiling CPCCWHS2001 Apply WHS requirements
locate and protect underground services RIICCM203D Read and interpret plans and job specifications RIICOM201D Communicate in the workplace RIIIMG301D Maintain site records RIIRIS301E Apply risk management processes RIIWHS201D Work safely and follow WHS policies and procedures RIIWHS202D Enter and work in confined spaces Elective units RIICCM205E Carry out manual excavation RIICCM206D Support plant operations RIICCM207D Spread and compact materials manually RIICCM208D Carry out basic levelling RIICCM210D Install trench support RIICCM302 Track directional boring operations RIICCM303 Conduct vacuum excavations RIICTT301E Conduct fluid assisted directional boring RIICTT303E Control micro tunnelling and pipe-jacking operations RIICTT309E Install slip lining in existing pipeline systems RIIHAN301E Operate elevating work platform RIIHAN307E Operate a vehicle loading crane RIISAM201D Handle resources and infrastructure materials and safely dispose of nontoxic materials RIISAM203D Use hand and power tools RIISAM204D Operate small plant and equipment RIIWMG203D Drain and dewater civil construction site RIICRC203D Install sub-soil drainage * We can develop additional elective units that are not listed on request (Please contact us for further information)
operate and troubleshoot medium enterprise routers ICTNWK508 Install
negotiate and refine a design brief If you require RPL Kits with comprehensive benchmarking
Learner Resources-ICTSUS603 Integrate sustainability in ICT planning and design projects Quote Core units ICTNWK502 Implement secureOur learner resources contain everything you need to begin training your learners. Our learner resources include: Learner Guide PowerPoint Presentation Session Plan Classroom Activities Self Study Guide Our learner resources have been aligned to learner cohorts, industry needs and ACSF indicated levels. In order to achieve this, we have conducted: Industry consultation Robust validations Assessment of best practice holistic delivery We provide all